EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [05] Red / 100pcs [E] 3mm Flickering Light
EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included
Color:[05] Red / 100pcs | Size:[E] 3mm Flickering Light Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".
- Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
- Product Features: Red Lights Flickering / 3mm Round Clear Lens / 29mm Long Lead
- Product Parameters: Candle Lights Keep Flickering / DC 2.0V-2.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
- Product Parameters: Luminance Brighter Up To +20% / Wavelength 620nm-625nm / 30 Viewing Angle / Single LED Diodes Wight: 0.16g
- Accessories: 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance
Related Products
Othmro 30 Pieces 3mm Blue LED...
Othmro 30 Pieces 3mm Blue LED Light Emitting Diodes Bulb LED Lamp Light Emitting Diodes DIY Christmas Light 30 pcs Blue
$80.00 AUD
Othmro 30 Pieces 3mm Blue LED Light Emitting Diodes Bulb LED Lamp Light Emitting Diodes DIY Christmas Light Size:30 pcs Blue Product description Wide applications, most commonly for: DIY LED Projects DIY Cards Small Science Experiments Party Decorations Signal Indicator Electronic and Electrical Experiments, Etc. Features: Bright Lighting,Low En...
AMX3d Lilypad Color LEDs – Red,...
AMX3d Lilypad Color LEDs – Red, Green, Blue & White Jewel LED with Internal Resistor for Lilypad E-Textiles and Wearable Projects - Jewel Power Connector Compatible - Pack of 20
$104.00 AUD
AMX3d Lilypad Color LEDs – Red, Green, Blue & White Jewel LED with Internal Resistor for Lilypad E-Textiles and Wearable Projects - Jewel Power Connector Compatible - Pack of 20 LilyPad Multicolor LEDs LilyPad is the Arduino based platform developed for wearable technology, and these LilyPad Multicolored LEDs are perfect for any project requ...
Novelty Place 100 Pcs (5 Colors...
Novelty Place 100 Pcs (5 Colors x 20pcs) 5mm White/Red/Yellow/Green/Blue LED Diode Lights - DC 2V-3V 20mA Emitting Diodes LEDs Bulb - DIY Science Project Electronics Components Lighting Kit
$82.00 AUD
Novelty Place 100 Pcs (5 Colors x 20pcs) 5mm White/Red/Yellow/Green/Blue LED Diode Lights - DC 2V-3V 20mA Emitting Diodes LEDs Bulb - DIY Science Project Electronics Components Lighting Kit PARAMETERSVoltage: R/Y 2.0-2.2V; B/G/W 3.0-3.2V, Current: 20 mA, Anode: Longer Leg, Viewing Angle: 30 degree.WIDE APPLICATIONThese LEDs can be widely used in...
DIYmall 7 Bits 7 X WS2812B...
DIYmall 7 Bits 7 X WS2812B 5050 RGB LED Ring Lamp Light with Integrated Drivers
$82.00 AUD
DIYmall 7 Bits 7 X WS2812B 5050 RGB LED Ring Lamp Light with Integrated Drivers Voltage:DC4-7V Communication interface:Single-wire communication LED Chip:WS2812B Conncetion: 5V to 5V pin 6 to DI GND to GND Package Included: 1 X 7 X WS2812 5050 RGB LED Voltage:DC4-7V Communication interface:Single-wire communication ...
Chanzon 100 pcs 2x3x4 White LED...
Chanzon 100 pcs 2x3x4 White LED Diode Lights 234 (Square Clear Transparent DC 3V 20mA) Bright Lighting Bulb Lamps Electronics Components Indicator Light Emitting Diodes A) White (100pcs)
$91.00 AUD
Chanzon 100 pcs 2x3x4 White LED Diode Lights 234 (Square Clear Transparent DC 3V 20mA) Bright Lighting Bulb Lamps Electronics Components Indicator Light Emitting Diodes Color:A) White (100pcs) Specification:Quantity: 100 pieces / PackLens: 2x3x4mm Diameter / Transparent / RectangleEmitting Color: White (6000K-9000K)Luminous Intensity: 1000-1200m...
microtivity IL611 5mm Diffused R...
microtivity IL611 5mm Diffused RGB Controllable LED, Common Cathode (Pack of 12)
$82.00 AUD
microtivity IL611 5mm Diffused RGB Controllable LED, Common Cathode (Pack of 12) A dozen RGB LEDs in diffused white casing. Three of the 4 pins controls Red, Green and Blue while the other one is Common Cathode. Packaged in a resealable bag for your convenience.
DIYmall 12 Bits 12 X WS2812B...
DIYmall 12 Bits 12 X WS2812B 5050 RGB Ring Lamp Light with Integrated Drivers
$84.00 AUD
DIYmall 12 Bits 12 X WS2812B 5050 RGB Ring Lamp Light with Integrated Drivers Voltage:DC4-7V Communication interface:Single-wire communication LED Chip:WS2812B Conncetion: 5V to 5V pin 6 to DI GND to GND Package Included: 1 X 12 X WS2812 5050 RGB LED LED Chip:WS2812B; Communication interface:Single-wire communication Diam...
Chanzon 100 pcs 5050 White 6000K...
Chanzon 100 pcs 5050 White 6000K SMD LED Diode Lights (Surface Mount 5mm x 5 mm 3 Chips/LED PLCC 6 pins 60mA 15-18LM) Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes A) White (100pcs)
$86.00 AUD
Chanzon 100 pcs 5050 White 6000K SMD LED Diode Lights (Surface Mount 5mm x 5 mm 3 Chips/LED PLCC 6 pins 60mA 15-18LM) Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes Color:A) White (100pcs) Specification:Quantity: 100 pieces / PackSize:5.0 X 5.0 (mm)Emitting Color: White (6000K-9000K)Luminous Intensity: 15-18LMViewi...
Othmro 3mm Red Blue 3pin LED...
Othmro 3mm Red Blue 3pin LED Diode Lights Clear Round Transparent 20mA Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes 50 pcs 50 pcs Red Blue Clear
$83.00 AUD
Othmro 3mm Red Blue 3pin LED Diode Lights Clear Round Transparent 20mA Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes 50 pcs Size:50 pcs Red Blue Clear Quantity: 50 pieces / Pack Lens: 3mm Diameter / Round Emitting Color: Red Blue(430nm) Luminous Intensity: 150mcd These light- emitting diodes work well for a wide v...
Othmro 40pcs 5mm White LED Diode...
Othmro 40pcs 5mm White LED Diode Lights Clear Straw Hat Transparent 3-3.4V 20mA Super Bright Lighting Bulb Lamps Electronic Component Light Emitting Diodes
$76.00 AUD
Othmro 40pcs 5mm White LED Diode Lights Clear Straw Hat Transparent 3-3.4V 20mA Super Bright Lighting Bulb Lamps Electronic Component Light Emitting Diodes Size:40pcs Quantity: 40 pieces / Pack Lens: 5mm Diameter / Straw Hat Emitting Color: White Forward Voltage / Current: 3V-3.4V / 20mA Polarity: Anode (Longer Part) | Cathode (Shorter Part) The...
microtivity IL386 4.8mm Assorted...
microtivity IL386 4.8mm Assorted Wide Angle Straw Hat LED w/Resistors (6 Colors, Pack of 60)
$95.00 AUD
microtivity IL386 4.8mm Assorted Wide Angle Straw Hat LED w/Resistors (6 Colors, Pack of 60) Contains 10 Reds, 10 Yellows, 10 Greens, 10 Blues, 10 Whites and 10 Pinks. These light-emitting diodes work well for a wide variety of applications including Arduino projects. Comes with some resistors for connection. Forward Voltages are Red, Orange, Ye...
Lamps 14V 0.1A (5 pieces)
Lamps 14V 0.1A (5 pieces)
$126.00 AUD
Lamps 14V 0.1A (5 pieces) mfg pn: DNW1-DW10 panel mount indicator lamp
VCC SMC 170 Series Fresnel Round...
VCC SMC 170 Series Fresnel Round Lens for 3mm T-1 LED, 0.171-Inch/4.3mm Diameter, Clear Retainer Ring, low profile
$94.00 AUD
VCC SMC 170 Series Fresnel Round Lens for 3mm T-1 LED, 0.171-Inch/4.3mm Diameter, Clear Color:clear | Style:Retainer Ring, low profile Available in several colors, the low profile VCC SMC 170 Series Fresnel Round Lenses provide even illumination for 3mm LEDs and fit into 0.171-inch/4.3mm diameter mounting holes on 0.250-inch centers. They featur...