Shop with us and enjoy complimentary shipping on all orders.

{"id":6829493256345,"title":"EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [05] Red \/ 100pcs [E] 3mm Flickering Light","handle":"edgelec-100pcs-3mm-red-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-2v-light-emitting-diode-lamp-bulb-100pcs-resistors-470ohm-for-dc-6-12v-included-05-red-100pcs-e-3mm-flickering-light","description":"\u003ch4\u003eEDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included\u003c\/h4\u003e\n\u003cp id=\"b\"\u003eColor:[05] Red \/ 100pcs | Size:[E] 3mm Flickering Light Low Energy\nConsumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely\nused and convenient for cperation. Soldering Condition (Manual\nSoldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow\nSoldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying\nPreservation And Keep Away From Fire Or High Temperature. Get other LED\nmodels? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Red Lights Flickering \/ 3mm Round Clear Lens \/ 29mm Long Lead\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Candle Lights Keep Flickering \/ DC 2.0V-2.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 620nm-625nm \/ 30 Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 470ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2021-06-10T02:06:03+10:00","created_at":"2021-06-10T02:06:03+10:00","vendor":"EDGELEC","type":"LED Lamps","tags":["music_update_2021"],"price":11400,"price_min":11400,"price_max":11400,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":40292739580057,"title":"[05] Red \/ 100pcs \/ [E] 3mm Flickering Light","option1":"[05] Red \/ 100pcs","option2":"[E] 3mm Flickering Light","option3":null,"sku":"B077X938JK","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [05] Red \/ 100pcs [E] 3mm Flickering Light - [05] Red \/ 100pcs \/ [E] 3mm Flickering Light","public_title":"[05] Red \/ 100pcs \/ [E] 3mm Flickering Light","options":["[05] Red \/ 100pcs","[E] 3mm Flickering Light"],"price":11400,"weight":45,"compare_at_price":null,"inventory_management":null,"barcode":"611355168064","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/soundstores.net\/cdn\/shop\/products\/B077X938JK.jpg?v=1649827203","\/\/soundstores.net\/cdn\/shop\/products\/51IqwHBJAIL_7d495840-d702-45b1-a46b-6dd08c13272c.jpg?v=1623330946","\/\/soundstores.net\/cdn\/shop\/products\/71e6kEpS-YL_2c117a5f-e54f-40d3-ac35-1027cd9c4945.jpg?v=1623330946","\/\/soundstores.net\/cdn\/shop\/products\/61MwHsW3elL.jpg?v=1623330946","\/\/soundstores.net\/cdn\/shop\/products\/51JYvsG1ClL.jpg?v=1623330946"],"featured_image":"\/\/soundstores.net\/cdn\/shop\/products\/B077X938JK.jpg?v=1649827203","options":["Color","Size"],"media":[{"alt":null,"id":26722889662617,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/soundstores.net\/cdn\/shop\/products\/B077X938JK.jpg?v=1649827203"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/products\/B077X938JK.jpg?v=1649827203","width":1300},{"alt":null,"id":22866276384921,"position":2,"preview_image":{"aspect_ratio":1.779,"height":768,"width":1366,"src":"\/\/soundstores.net\/cdn\/shop\/products\/51IqwHBJAIL_7d495840-d702-45b1-a46b-6dd08c13272c.jpg?v=1623330946"},"aspect_ratio":1.779,"height":768,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/products\/51IqwHBJAIL_7d495840-d702-45b1-a46b-6dd08c13272c.jpg?v=1623330946","width":1366},{"alt":null,"id":22866276417689,"position":3,"preview_image":{"aspect_ratio":1.5,"height":1067,"width":1600,"src":"\/\/soundstores.net\/cdn\/shop\/products\/71e6kEpS-YL_2c117a5f-e54f-40d3-ac35-1027cd9c4945.jpg?v=1623330946"},"aspect_ratio":1.5,"height":1067,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/products\/71e6kEpS-YL_2c117a5f-e54f-40d3-ac35-1027cd9c4945.jpg?v=1623330946","width":1600},{"alt":null,"id":22866276450457,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/soundstores.net\/cdn\/shop\/products\/61MwHsW3elL.jpg?v=1623330946"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/products\/61MwHsW3elL.jpg?v=1623330946","width":1300},{"alt":null,"id":22866276483225,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/soundstores.net\/cdn\/shop\/products\/51JYvsG1ClL.jpg?v=1623330946"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/products\/51JYvsG1ClL.jpg?v=1623330946","width":1300}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch4\u003eEDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included\u003c\/h4\u003e\n\u003cp id=\"b\"\u003eColor:[05] Red \/ 100pcs | Size:[E] 3mm Flickering Light Low Energy\nConsumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely\nused and convenient for cperation. Soldering Condition (Manual\nSoldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow\nSoldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying\nPreservation And Keep Away From Fire Or High Temperature. Get other LED\nmodels? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Red Lights Flickering \/ 3mm Round Clear Lens \/ 29mm Long Lead\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Candle Lights Keep Flickering \/ DC 2.0V-2.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 620nm-625nm \/ 30 Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 470ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e"}

EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [05] Red / 100pcs [E] 3mm Flickering Light

In Stock. Leaves warehouse within 2 - 3 business days

$114.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

EDGELEC 100pcs 3mm Red Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included

Color:[05] Red / 100pcs | Size:[E] 3mm Flickering Light Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Red Lights Flickering / 3mm Round Clear Lens / 29mm Long Lead
  • Product Parameters: Candle Lights Keep Flickering / DC 2.0V-2.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 620nm-625nm / 30 Viewing Angle / Single LED Diodes Wight: 0.16g
  • Accessories: 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance