Shop with us and enjoy complimentary shipping on all orders.

{"id":8934128943257,"title":"Super Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32) Model 2=01678","handle":"super-starlight-pro-vehicle-camera-170-wide-angle-night-vision-rear-view-camera-reverse-parking-for-audi-a6l-q7-a3-a4-a6-a8-a5-s4-s6-s3-rs4-rs6model-b-110-32-model-2-01678","description":"\u003ch3\u003eSuper Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eDear customer,Please must check the camera size and appearance before place a\norder, see if can fit your car license plate lamp place size and appearance!\nBecause the same car model in different countries may have some\ndifference,please check the camera size and compare the installation of your\ncar carefully to avoid mistake. This product could fit for all below models as\nexpected:For Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6- Image sensor: 1\/3\ninch Color CCD- Viewing angle: 170 degrees- TV system: NTSC standard and if\nneed PAL, please leave a message- Effective pixels: 1280720 Pixels-\nResolution: 1000 TV lines- Power supply: DC 12V- Waterproof: IP67- Working\ntemperature: -40~ 70℃\/ -40~ 158℉Package Contents1 x Car Rear view Camera1 x\nPower Cable (1.5m\/4.9ft) 1 x AV Cable (6m\/19ft) 1 x User Manual\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eBackup Parking vehicle Camera Suitable for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6\u003c\/li\u003e\n \u003cli\u003e1280*720 pixels 1000 TV lines 170 degree visible range works great with the blind spot\u003c\/li\u003e\n \u003cli\u003ePackage includes:1 x CCD Car Camera,1x user manual,1 x 6M video cable,1 X power supply cable\u003c\/li\u003e\n \u003cli\u003eRoute the cable from tailgate to front dash, connect to display with universal RCA connector, you may need additional adapter (not included) if to connect factory radio\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2026-08-27T00:45:20+10:00","created_at":"2026-08-26T15:24:48+10:00","vendor":"Navinio","type":"Vehicle Backup Cameras","tags":["electronics_selected_Aug2026"],"price":18700,"price_min":18700,"price_max":18700,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":48936668299417,"title":"Model 2=01678","option1":"Model 2=01678","option2":null,"option3":null,"sku":"B07H7KGW2J","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Super Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32) Model 2=01678 - Model 2=01678","public_title":"Model 2=01678","options":["Model 2=01678"],"price":18700,"weight":113,"compare_at_price":null,"inventory_management":"shopify","barcode":"01678DJT","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/soundstores.net\/cdn\/shop\/files\/B07H7KGW2J.jpg?v=1787721890","\/\/soundstores.net\/cdn\/shop\/files\/51GEh0FQPPL.jpg?v=1787721891","\/\/soundstores.net\/cdn\/shop\/files\/71Av1wbS-nL.jpg?v=1787721891","\/\/soundstores.net\/cdn\/shop\/files\/61sewkNJmjL_d817bd37-c7eb-4b6c-a363-2c3a23aec5b3.jpg?v=1787721891","\/\/soundstores.net\/cdn\/shop\/files\/716na0AVpoL_86248b91-f1cb-44fd-abc2-9c9f288d9208.jpg?v=1787721891","\/\/soundstores.net\/cdn\/shop\/files\/71KKNjtCT7L_b2f3e299-3592-4e30-b672-1d9afa43c56c.jpg?v=1787721891","\/\/soundstores.net\/cdn\/shop\/files\/617zmQAoMPL_50cc2116-e298-4112-9435-f1277f4eb7e2.jpg?v=1787721891"],"featured_image":"\/\/soundstores.net\/cdn\/shop\/files\/B07H7KGW2J.jpg?v=1787721890","options":["Color"],"media":[{"alt":null,"id":37271232839833,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/B07H7KGW2J.jpg?v=1787721890"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/B07H7KGW2J.jpg?v=1787721890","width":1000},{"alt":null,"id":37271232872601,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/51GEh0FQPPL.jpg?v=1787721891"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/51GEh0FQPPL.jpg?v=1787721891","width":1000},{"alt":null,"id":37271232905369,"position":3,"preview_image":{"aspect_ratio":0.85,"height":1176,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/71Av1wbS-nL.jpg?v=1787721891"},"aspect_ratio":0.85,"height":1176,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/71Av1wbS-nL.jpg?v=1787721891","width":1000},{"alt":null,"id":37271232938137,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/61sewkNJmjL_d817bd37-c7eb-4b6c-a363-2c3a23aec5b3.jpg?v=1787721891"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/61sewkNJmjL_d817bd37-c7eb-4b6c-a363-2c3a23aec5b3.jpg?v=1787721891","width":1000},{"alt":null,"id":37271232970905,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/716na0AVpoL_86248b91-f1cb-44fd-abc2-9c9f288d9208.jpg?v=1787721891"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/716na0AVpoL_86248b91-f1cb-44fd-abc2-9c9f288d9208.jpg?v=1787721891","width":1000},{"alt":null,"id":37271233003673,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/71KKNjtCT7L_b2f3e299-3592-4e30-b672-1d9afa43c56c.jpg?v=1787721891"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/71KKNjtCT7L_b2f3e299-3592-4e30-b672-1d9afa43c56c.jpg?v=1787721891","width":1000},{"alt":null,"id":37271233036441,"position":7,"preview_image":{"aspect_ratio":0.957,"height":1045,"width":1000,"src":"\/\/soundstores.net\/cdn\/shop\/files\/617zmQAoMPL_50cc2116-e298-4112-9435-f1277f4eb7e2.jpg?v=1787721891"},"aspect_ratio":0.957,"height":1045,"media_type":"image","src":"\/\/soundstores.net\/cdn\/shop\/files\/617zmQAoMPL_50cc2116-e298-4112-9435-f1277f4eb7e2.jpg?v=1787721891","width":1000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eSuper Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eDear customer,Please must check the camera size and appearance before place a\norder, see if can fit your car license plate lamp place size and appearance!\nBecause the same car model in different countries may have some\ndifference,please check the camera size and compare the installation of your\ncar carefully to avoid mistake. This product could fit for all below models as\nexpected:For Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6- Image sensor: 1\/3\ninch Color CCD- Viewing angle: 170 degrees- TV system: NTSC standard and if\nneed PAL, please leave a message- Effective pixels: 1280720 Pixels-\nResolution: 1000 TV lines- Power supply: DC 12V- Waterproof: IP67- Working\ntemperature: -40~ 70℃\/ -40~ 158℉Package Contents1 x Car Rear view Camera1 x\nPower Cable (1.5m\/4.9ft) 1 x AV Cable (6m\/19ft) 1 x User Manual\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eBackup Parking vehicle Camera Suitable for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6\u003c\/li\u003e\n \u003cli\u003e1280*720 pixels 1000 TV lines 170 degree visible range works great with the blind spot\u003c\/li\u003e\n \u003cli\u003ePackage includes:1 x CCD Car Camera,1x user manual,1 x 6M video cable,1 X power supply cable\u003c\/li\u003e\n \u003cli\u003eRoute the cable from tailgate to front dash, connect to display with universal RCA connector, you may need additional adapter (not included) if to connect factory radio\u003c\/li\u003e\n \u003c\/ul\u003e"}

Super Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32) Model 2=01678

In Stock. Leaves warehouse within 2 - 3 business days

$187.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Super Starlight pro Vehicle Camera 170 Wide Angle Night Vision Rear View Camera Reverse Parking for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6(Model B=110 * 32)

Dear customer,Please must check the camera size and appearance before place a order, see if can fit your car license plate lamp place size and appearance! Because the same car model in different countries may have some difference,please check the camera size and compare the installation of your car carefully to avoid mistake. This product could fit for all below models as expected:For Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6- Image sensor: 1/3 inch Color CCD- Viewing angle: 170 degrees- TV system: NTSC standard and if need PAL, please leave a message- Effective pixels: 1280720 Pixels- Resolution: 1000 TV lines- Power supply: DC 12V- Waterproof: IP67- Working temperature: -40~ 70℃/ -40~ 158℉Package Contents1 x Car Rear view Camera1 x Power Cable (1.5m/4.9ft) 1 x AV Cable (6m/19ft) 1 x User Manual

Product Features

  • Backup Parking vehicle Camera Suitable for Audi A6L Q7 A3 A4 A6 A8 A5 S4 S6 S3 RS4 RS6
  • 1280*720 pixels 1000 TV lines 170 degree visible range works great with the blind spot
  • Package includes:1 x CCD Car Camera,1x user manual,1 x 6M video cable,1 X power supply cable
  • Route the cable from tailgate to front dash, connect to display with universal RCA connector, you may need additional adapter (not included) if to connect factory radio